Formwork provides a mould, into which concrete is placed. When concrete has hardened the formwork is removed. Formwork must be:
- ACCURATE
- STRONG, and
- WELL MADE.
SERVICES Plumbing, heating or electrical services are run through a slab. These services need to be 'roughed in' before any concrete is poured. Our plumber lays out placement of trenches that slope from the furthest plumbing fixture, through the house and to the sewer at the street, all other plumbing fixtures; sinks, tubs and toilets tie into the main waste line along the way. Once the services are in place, a vapour barrier is put in place. The Vapour barrier, is a heavy plastic covering used to minimise water vapour rising through the hardened concrete.